Caltrain, Broadway/Burlingame Grade Separation Preliminary Design
Caltrain, Broadway/Burlingame Grade Separation Preliminary Design
PROJECT INFORMATION
Project Owner
Peninsula Corridor Joint Powers Board (PCJPB)
Location:
Bay Area
Dates:
02/01/2019 - 12/31/2019

Caltrain, Broadway/Burlingame Grade Separation Preliminary Design

As a subconsultant team member, GUIDA provided topographic design surveys, mapping, and right of way surveys to support the preliminary engineering design for the Broadway/Burlingame Grade Separation project. The project grade separates the railroad utilized by Caltrain and Broadway to relieve traffic congestion. The scope of work included horizontal and vertical controls, topographic field surveys, topographic mapping, digital terrain models, terrestrial LiDAR, initial right of way surveys and mapping, and other miscellaneous survey tasks to support the design engineering team.

SERVICES PROVIDED

Topographic Survey

Mapping

Right of Way Survey

Terrestrial LiDAR

Digital Terrain Models

No items found.