City of Fremont, Sabercat Bicycle/Pedestrian Bridge Project
City of Fremont, Sabercat Bicycle/Pedestrian Bridge Project
PROJECT INFORMATION
Project Owner
City of Fremont
Location:
Bay Area
Dates:
03/01/2020 - 09/23/2024

City of Fremont, Sabercat Bicycle/Pedestrian Bridge Project

The Sabercat Bicycle/Pedestrian Bridge over I-680 will provide a safe connection from Ohlone College to the future Irvington BART station. In addition to the bridge structure, the project includes new and improved trails, a pedestrian undercrossing of the UPRR/BART corridor, various road improvements, and preparation for a future paleontological museum with associated parking area. GUIDA'S surveying and mapping services include aerial mapping and imagery, design topographic surveys, land net surveys, and right of way engineering.

SERVICES PROVIDED

Land Net Surveys

Aerial Mapping

Right of Way Survey

Topographic Survey

No items found.