This Metro project will add an eastbound auxiliary lane between the I-710 Freeway on-ramp and the Cherry Avenue off-ramp on the SR-91. This project is part of Metro’s I-605 Hot Spot Program, which is focused on making improvements that will help to reduce chronic traffic congestion and enhance safety for drivers along the I-605 Freeway and the SR-91.
GUIDA'S services on this project included, but were not limited to, performing corridor control surveys; performing project control surveys; performing supplemental control surveys; preparing base mapping; preparing base photogrammetric maps and products; conducting initial Land Net recovery and field ties; preliminary boundary determination; surveying all project boring and pothole locations; preparing right of way plans and appraisal maps.
Control Survey
Base Mapping
Photogrammetric Maps
Right of Way
Boundary Determination
Land Net Survey