OCTA, SR-55 Between I-405 and I-5 (All Phases)
OCTA, SR-55 Between I-405 and I-5 (All Phases)
PROJECT INFORMATION
Project Owner
Orange County Transportation Authority (OCTA)
Location:
Orange County
Dates:
PA/ED – May 2011 – July 2013, PS&E – December 2018 – January 2022, CM – October 2021 – September 2025

OCTA, SR-55 Between I-405 and I-5 (All Phases)

OCTA, in cooperation with Caltrans, is widening the SR-55 in both directions, from just north of the I-405/SR-55 Interchange to just south of the I-5/SR-55 Interchange in the cities of Santa Ana, Tustin, and Irvine. This $475.1M improvement project to one of Orange County’s most crucial freeway corridors will reduce congestion and fulfill OCTA’s commitment to keep commuters moving. The proposed project limits cover a distance of a 4-mile corridor, adding general purpose and high-occupancy vehicle lanes in each direction between I-405 and I-5 and auxiliary lanes between interchanges.

As a subconsultant, GUIDA has provided land surveying and mapping services for both the PA/ED and PS&E phases of this OCTA project. Additionally, GUIDA'S team is contracted to provide surveying services for the current CM phase of this ongoing project.

SERVICES PROVIDED

Aerial Topography

Freeway Survey

Legal Descriptions

Right of Way Engineering

Utility Survey

Horizontal and Vertical Control Surveys

Aerial Photogrammetric Mapping

Topographic Design Surveys

Initial Land Net Mapping

Verification Surveys

Digital Terrain Model

Mobile Lidar and Ground Survey Data

Construction Survey

Calculations and Adjustments

Right of Way Survey

Monumentation

No items found.